Skip to main content

Athearn Genesis SP Mt-4 4-8-2 Locomotive 4360

Discuss

Prototype Details

ALCO
-
-
-
Transition (1940 - 1960)
Steam (1880 - 1940)
1950s
1940s
-
-
-

Boiler backhead with full details and printed gauges. Individually applied detail parts such as piping, valves, generators, etc. Blackened metal RP25 wheels. 22" recommended minimum radius. Front coupler pocket can be inserted to mount operating coupler. Headlights and tender lights feature directional lighting. Five-pole, skewed armature motor with two flywheels for very smooth running. Factory installed DCC sound board with single speaker. DCC decoder automatically senses the power supply type (either DC or NMRA compliant DCC system). Non sound version will be DCC-ready with 8-pin and 9-pin plugs installed.

Initial Source: 01_Gen_MT4_051810.pdf